We classify every crack before injecting it — structural cracks get epoxy, active leaks get flexible polyurethane, and both get a written scope before we start.

Not every Sherwood, OH foundation crack needs the same material or approach. A vertical settlement crack behaves differently than a stair-step block crack, and we adjust injection technique and material to match what's actually happening in the wall.
Misclassifying a crack is the most common mistake in this trade, and it's the first thing we check on every Sherwood, OH job.
Most crack injection appointments can be scheduled within a day or two of your call.
Pricing is based on crack length and injection material, quoted in writing before we drill any injection ports.
Polyurethane expands to fill voids behind an actively weeping wall; epoxy is reserved for cracks that need structural bonding.

Every Sherwood, OH Foundation Crack Repair job starts with an inspection, not a generic package — here's what that typically includes.
Epoxy-injected cracks regain much of their original structural strength, which matters for load-bearing foundation walls.
Cracks that are still weeping get flexible polyurethane, which expands into voids and stays flexible enough to handle minor seasonal movement.
Stair-step cracking in block foundation walls needs a different injection port pattern than a vertical crack in poured concrete, and we adjust technique accordingly.
We document crack width and location with photos before and after injection so you have a record of the repair.
Fast turnaround matters during a real estate transaction, and we prioritize scheduling for time-sensitive pre-sale repairs.

Tell us the crack's location, whether it's actively leaking, and roughly how wide it is so we can bring the right materials.
We also check the exterior grading near the crack, since poor drainage is often what caused it in the first place.
You'll get a price based on crack length and material — epoxy or polyurethane — before any drilling starts.
Most single-crack injections are completed in a few hours, start to finish, in one visit.

"We were selling the house and the inspector flagged a foundation crack. They came out within two days, injected epoxy, and gave us documentation for the buyer's lender."
— Sherwood Seller
"Polyurethane injection stopped an active leak the same day they showed up — didn't expect it to be that fast."
— Sherwood Homeowner
"Appreciated the before-and-after photos for our records in case we ever need them for a future sale."
— Sherwood Customer
"Fast, clean work — no mess left behind after the injection ports were patched."
— Sherwood Homeowner
Crack classification is separate from water contamination — we assess whether the crack is structural or cosmetic based on width, pattern, and any wall bowing.
We repair cracks of nearly any size — hairline cracks are often the easiest and cheapest to seal before they widen further.
We make the call on-site after inspecting the crack, not before we've seen it.
Multiple cracks or hard-to-access areas can extend the timeline, which we'll flag in the written quote.
If new movement occurs elsewhere in the wall, that's a separate issue we'd assess independently.
Yes — we provide before-and-after photos and a repair summary that Sherwood, OH buyers, sellers, and lenders commonly request.
We handle foundation crack injection throughout Sherwood and the surrounding Sherwood, OH service area, including the zip codes listed below.



Zip codes we serve in Sherwood, OH: 45230 43556
One call gets you a licensed specialist, a written quote, and a same-day time window.
Call +1-866-476-1348© SGP Waterproofing. All rights reserved.